Project Updates and Notices

2024 Information - More Coming Soon!


Project Map

Please see below for an interactive map of the City's ongoing projects. To view the map legend, please select the arrow button in the top left corner of the window below. You may also select the button in the top right corner to view a larger map in a new window. 

Additional information about each project can be found in the tables below the project map. 


2024 Capital Construction Projects 

Project Name

Description

Status

Additional Information

Southgate Servicing - Land Development

This project will include installing approximately 800m of sewer main, 500m of sanitary sewer force main and 800m of water main to service the lots in the Southgate Industrial area. The work also includes the installation of a new lift station and stormwater pumping station. 

Construction is ongoing. 

Construction Notice - Southgate Industrial Servicing - Hodgins Dr - April 9 2024

2024 Sidewalk Program 

This project will primarily include replacing the sidewalk panels on the west side of the 500 Block of Main Street and the concrete curb on the east side of the 700 Block of Main Street. Small spot repairs on Priority Streets will also be completed as budget allows. 

 

Project is currently in design & tender phase.

Construction tentatively scheduled Summer 2024.  

Coming Soon!


2024 Watermain Replacement Project 

This project will include replacing approximately 400m of water main infrastructure on the 100 & 200 Blocks of Osborne Street. 

Project is currently in the tender evaluation and contract award phase.

Construction tentatively scheduled Summer 2024.  

Coming Soon!

New Landfill Cell Construction

The decision to build a new engineered landfill cell comes after thorough research and analysis of the City’s waste management needs.  With the current landfill reaching capacity and no longer meeting the Ministry of Environment's current standards, the need for a new facility has become increasingly urgent.

The new engineered landfill will incorporate the required waste management technologies, including but not limited to engineered liners and leachate collection systems. By meeting these requirements, the City of Melfort is ensuring that its operations are safe, efficient, and environmentally sustainable.

This project is currently in the design and tendering phase. Coming Soon! 

Landfill Decommissioning Project

The objective of this project is complete a progressive closure of the existing landfill cell over the next two years as the site reaches maximum capacity for waste. Our existing site needs to be decommissioned to prevent possible environmental harm and ensure proper waste management practices. 

This project is currently in the design phase.

Upcoming

Coming Soon!

2024 Urban Highway Connector Program (UHCP) - Sask Drive Rehabilitation Through the Urban Highway Connector Program with the Ministry of Highways, this project will include resurfacing approximately 500m of roadway along SK Drive South.
This project is currently in the design and tender phase. Coming Soon!
2024 Community Airport Partnership (CAP) Program - Internal Taxiway Paving Through this grant program offered through the Government of Saskatchewan in support of local airports, this project will include paving the gravel taxiways surrounding the hangers at the Miller Field Airport. This project is currently in the design and tender phase. Coming Soon! 

Plans & Studies 

Name

Description

Status

Target Completion

Water Distribution Master Plan & Reservoir Concept Plan

More Information Coming Soon!Upcoming December 2024 

Please contact us with any additional questions you may have about our ongoing projects! 
 
City of Melfort

202 Burrows Avenue West
PO Box 2230, Melfort, Saskatchewan, Canada  S0E 1A0
Telephone: 306-752-5911
Facsimile: 306-752-5556